Göstahallen, Öckerö
)
)
projektkontakt
Carl-Gunnar Wiktorsson CEO, Wicote
Description of the project
Soaring electricity prices during the energy crisis in 2023 triggered Öckerö Fotboll's need to be able to better control their energy costs while also utilising the space on the training hall’s roof. The hall, which offered generous areas at a good height with good sun conditions and no disturbances, created the perfect conditions for installing solar panels. With solar panels on the roof, the club was able to produce, manage and sell its own renewable electricity and thus take control of its operating costs.

Durable solar panels on storm island
The vulnerable location at an open and exposed location on an island entailed harsh weather conditions and frequent storms. To ensure that the roof would last for at least 30 years, it was particularly important for Wicote to use durable and sustainable material. 256 solar panel modules were installed on a roof area of 3,000 sqm, which covers the entire requirement of the hall. The solar panels were attached using Alkorsolar rails, which are secure and resistant to strong winds. The project also used canvas, which is a lightweight material that reflects heat, helping to lower the indoor temperature during the summer months.
)
)